Lyncole's Site Specific Engineered Design

Lyncole's Technical Services employs years of real-world experience and a scientific, engineering process to design grounding systems that meet or exceed any site's grounding requirements.

Our 4-Step Ground System Design Methodology is the process we use to achieve a predictable, controlled result. The purpose of the 4-Step Methodology is to provide a grounding system design with predictable performance. The result is that the grounding system performance will be known prior to installation. It eliminates the need for continued efforts and site visits.

Each grounding system we design is made to the specific site where it will be installed and to meet or exceed our client's requirements. Whether computer clean rooms, communication towers, environmental challenging conditions, or mobile units as used by American Forces in Desert Storm, or other unique installations - Lyncole is the originator and leader in the field.